19-20 POLAND STREET

19-20 POLAND STREET

London W1

Back to portfolio

SERVICES PROVIDED:

Main Contracting

CLIENT:

Chapman & Button Cogress

CONSTRUCTION VALUE:

£3.0 million

START DATE:

August 2015

COMPLETION DATE:

August 2016

ARCHITECTS:

Waugh Thistleton

STRUCTURAL ENGINEERS:

DCL Ltd

MECHANICAL & ELECTRICAL:

LSD Ltd

PROJECT MANAGERS:

Measur Ltd

Employed as the main contractor on the extension and refurbishment of 9 high end apartments on a period property at 19-20 Poland St Soho London. The property covers 8500sqft and ChampionBuild worked closely with the design teams on this complex refurbishment.

The existing building was extended to the rear and an additional mansard level with roof garden on top. For this to be created, we were required to remove the existing lift shaft and stair cores. This was done by installing temporary works throughout the structure and then began the process of removing the rear façade, lift shaft and stair core. Running parallel, we were responsible for applying another level whilst maintaining a live restaurant on the ground floor.

The roof and rear structure was extended using structural steel, timber joists, lewis decking and screeds. The rear façade construction was made up of metal substrata, render systems and aluminium windows.

ChampionBuild also had the responsibility for the complete fit out which included herringbone flooring, marble bathroom, bespoke joinery & kitchens, full mechanical, electrical, AC and AV systems throughout each apartment.